Installation library

02 / Direct field training

Lay out and install the bottom-plate condition.

A direct training page for plate layout, anchorage, tolerances, and the checks that happen before the first panel is set.
Video coming soon

Bottom plate

Use the interactive lesson, written steps, and linked guide while the instructional video is being prepared.

Plate and track layout within the wall setup

Choose your system to open the narrated 3D lesson.
Before work begins

Use the approved project documents.

This training page explains a typical workflow. The project's sealed drawings, approved details, fastening schedule, manufacturer instructions, adopted code, and field conditions control.

Open the current installation hub

Field sequence

Three checks to keep attached to the task.

  1. 01

    Confirm slab dimensions and approved plate locations before drilling or fastening.

  2. 02

    Follow the project-specific anchor, seal, and moisture-separation details.

  3. 03

    Resolve out-of-tolerance conditions with the project team before panel setting.

Keep moving

Related field pages

01

Set + brace

Open page
03

Alter a panel

Open page
04

Bucks + headers

Open page