Installation library

06 / Direct field training

Add blocking and complete panel connections.

Plan attachment points for cabinets, fixtures, finishes, and intersecting walls before the assembly is closed.
Video coming soon

Blocking + connections

Use the interactive lesson, written steps, and linked guide while the instructional video is being prepared.

Related lesson: connect and anchor panels

Choose your system to open the narrated 3D lesson.
Before work begins

Use the approved project documents.

This training page explains a typical workflow. The project's sealed drawings, approved details, fastening schedule, manufacturer instructions, adopted code, and field conditions control.

Open the wall-blocking guide

Field sequence

Three checks to keep attached to the task.

  1. 01

    Locate the required backing and connection points from the approved plans.

  2. 02

    Install blocking without interrupting required panel framing or water-control details.

  3. 03

    Document concealed work when the project team requires inspection records.

Keep moving

Related field pages

01

Set + brace

Open page
02

Bottom plate

Open page
03

Alter a panel

Open page