
IFP / ThermaTech panel system
Insulated Framing Panel
Shop-fabricated, standard-height wall segments with a continuous EPS core between opposing dimensional-wood stud layers. IFP is designed around familiar plates, fastening surfaces, and residential erection practices.
Inside IFP
One panel. Every angle.
Loading the panel…
The complete wall-panel assembly
Get close to the panel itself, including the plates that connect it to the building.
- Framing faces
- Wood framing inside and outside
- Insulation
- Continuous EPS core
- Bottom connection
- Double treated wood bottom plate
- Top connection
- Double wood top plate
Illustrative configuration. Approved project drawings, engineering, and manufacturer instructions control dimensions and connections.
Why this configuration
Familiar framing. Integrated insulation.
Residential projects that want wood attachment surfaces and a familiar erection sequence with fewer wall components fabricated on site.
Standard-height installation approach
Open horizontal wire chases
Project-sized openings available
What the project team confirms
A panel system still belongs to a complete building.
ThermaTech helps coordinate the panel package, while the design team and approved project documents establish how it connects to the rest of the enclosure and structure.
- 01Project-specific structural and connection design
- 02Opening, header, buck, and panel layout
- 03Exterior sheathing, water-control, and finish strategy
- 04Electrical routing, blocking, and permitted field changes
Plans to panels
A coordinated path to standing walls.
The sequence is planned around the selected system, project conditions, approved details, and the crew that will install it.
- 01
Review the wall plan
Coordinate wall lengths, openings, loading, finishes, and project-specific engineering.
- 02
Fabricate the segments
Cut framing, EPS, openings, and the numbered panel sequence before delivery.
- 03
Set familiar wood components
Install the treated plate and numbered segments using the approved project fastening schedule.
- 04
Complete the enclosure
Coordinate sheathing, water control, interfaces, services, and finishes with the approved documents.
Installation sequence, bracing, fasteners, connections, water control, and permitted field modifications are established by the approved project documents.
System education
Take the assembly from drawing review to hands-on understanding.
ThermaTech can walk project teams through system selection, details, installation sequence, and field coordination in a focused team session or live wall demonstration.
Explore Lunch & Learn sessionsSystem resources
Start with the guide. Keep the project documents in control.
Use these resources to understand the current field workflow and the engineering pathway. Confirm applicability for the exact project before construction.
IFP Panel Installation Guide
Current photo-led field sequence. Approved project documents and engineered details control.
Open guide Field supportHow-to instructions and video library
Task-specific instructions and spaces for approved videos are gathered in one place.
Open how-to library EngineeringIFP / IHP alternative-material review
Engineering opinion only; project-specific sealed design and local-authority acceptance remain required.
Open reviewKeep exploring
Compare the other ThermaTech systems.
Start with the plans
Let's map the right system to your project.
Share the building type, location, plans, schedule, crew, and priorities. ThermaTech can review system fit and the next coordination steps.
Start a project review

