
IHP W/M / ThermaTech panel system
IHP Wood / Metal
Exterior cold-formed steel framing and interior wood framing are separated by a continuous EPS core. The exterior-facing frame reduces exterior wood exposure while the inside remains familiar for finish trades.
Inside IHP · Wood / Metal
One panel. Every angle.
Loading the panel…
The complete wall-panel assembly
Get close to the panel itself, including the plates that connect it to the building.
- Framing faces
- Wood framing inside; steel studs outside
- Insulation
- Continuous EPS core
- Bottom connection
- Steel bottom track
- Top connection
- Steel top track with a single wood top plate
Illustrative configuration. Approved project drawings, engineering, and manufacturer instructions control dimensions and connections.
Why this configuration
Steel outside. Wood inside.
Projects prioritizing an exterior steel framing face without giving up a conventional interior wood fastening surface.
Reduced exterior wood exposure
Conventional interior fastening surface
Project-engineered configurations available
What the project team confirms
A panel system still belongs to a complete building.
ThermaTech helps coordinate the panel package, while the design team and approved project documents establish how it connects to the rest of the enclosure and structure.
- 01Project-specific structural and connection design
- 02Exterior steel fastening and finish attachment strategy
- 03Opening, header, buck, and flashing details
- 04Corrosion exposure, water control, and material compatibility
Plans to panels
A coordinated path to standing walls.
The sequence is planned around the selected system, project conditions, approved details, and the crew that will install it.
- 01
Map both framing faces
Coordinate loads, finishes, openings, connections, and attachment needs for the steel and wood layers.
- 02
Fabricate the hybrid package
Build the numbered panel layout with exterior steel, continuous EPS, and interior wood framing.
- 03
Install with approved fasteners
Set and connect the panels using the project-specific steel-to-wood and anchorage schedule.
- 04
Detail every interface
Complete seams, openings, water control, services, and finishes using approved project documents.
Installation sequence, bracing, fasteners, connections, water control, and permitted field modifications are established by the approved project documents.
System education
Take the assembly from drawing review to hands-on understanding.
ThermaTech can walk project teams through system selection, details, installation sequence, and field coordination in a focused team session or live wall demonstration.
Explore Lunch & Learn sessionsSystem resources
Start with the guide. Keep the project documents in control.
Use these resources to understand the current field workflow and the engineering pathway. Confirm applicability for the exact project before construction.
IHP Panel Installation Guide
Current photo-led field sequence. Approved project documents and engineered details control.
Open guide Field supportHow-to instructions and video library
Task-specific instructions and spaces for approved videos are gathered in one place.
Open how-to library EngineeringIFP / IHP alternative-material review
Engineering opinion only; project-specific sealed design and local-authority acceptance remain required.
Open reviewKeep exploring
Compare the other ThermaTech systems.
Start with the plans
Let's map the right system to your project.
Share the building type, location, plans, schedule, crew, and priorities. ThermaTech can review system fit and the next coordination steps.
Start a project review

